Market Opportunity Analysis
Immediate Addressable Market
Office Buildings (500m radius) | 12 buildings |
Total Office Workers | 8,500 people |
Average Daily Rooftop Traffic | 3,500 visits |
Current Meeting Spaces | 0 outdoor options |
Current F&B Outlets | 0 rooftop locations |
Identified Service Gap | 100% |
User Demographics & Demand
User Segment | Volume | Willingness to Pay |
---|---|---|
Executive Meetings | 450/month | AED 150-250/hour |
Team Sessions | 680/month | AED 100-150/hour |
Client Entertainment | 220/month | AED 200-300/hour |
Coffee Consumers | 1,200/day | AED 12-25/cup |
Key Insight: Combined user segments represent an untapped market of AED 7.8M in annual potential revenue
Our Premium Solutions

EBRA-MP860 Executive Pavilion
8m × 5m Premium Meeting Space
Complete Turnkey Solution (DDP Dubai)
Specification | Details |
---|---|
Total Area | 40m² (30m meeting + 10m storage) |
Capacity | 8-10 people comfortably |
Frame System | Aluminum RAL 9005 with curved roof |
Glazing | Low-E laminated safety glass |
Includes | Full electrical, fire safety, HVAC-ready |
Installation | Professional 2-3 day setup included |
Complete structure + technical works
Full structural coverage
LED lighting & track systems
HVAC ducting pre-installed

EBRA-FB530 Coffee Kiosk
5m × 3m Fully Equipped F&B Solution
Ready to Operate
Specification | Details |
---|---|
Service Area | 15m² optimized layout |
Daily Capacity | 300-500 beverages |
Cladding | Premium IPE wood finish |
Service Window | Full sliding glass system |
Counter | Stainless steel barista setup |
Power | 3-phase ready, DEWA compliant |
Complete F&B setup
Water, drainage, electrical
All-season operation
Everything included
Investment & Returns Analysis
Annual ROI
Realistic scenario at 65% utilization
Months Payback
Based on actual quotation figures
Annual Revenue
Combined pavilion + kiosk potential
5-Year NPV
Net present value projection
Project Investment Summary
Executive Pavilion (Complete) | AED 211,183 |
Coffee Kiosk (Complete) | AED 134,463 |
Optional Furniture Package | AED 62,895 |
Base Project Total | AED 345,646 |
Complete with Furniture | AED 408,541 |
Competitive Advantage Analysis
Meeting Space Alternatives
Alternative | Cost | Limitations | Our Advantage |
---|---|---|---|
Hotel Meeting Rooms | AED 300-500/hr | Indoor only, off-site location, advance booking required | 50% cheaper, on-site, outdoor views |
Co-working Spaces | AED 200-400/hr | Membership required, limited privacy, noisy environment | No membership, unique setting, full privacy |
Internal Boardrooms | Free | Overbooked, no ambiance, limited technology | Premium experience, always available |
F&B Alternatives
Alternative | Wait Time | Quality | Price | Our Advantage |
---|---|---|---|---|
Ground Floor Cafes | 20-25 min | Variable | AED 15-20 | 5 min wait, consistent quality |
Vending Machines | 2 min | Poor | AED 5-8 | Barista quality, premium options |
Delivery Services | 30-45 min | Cold/stale | AED 20-30 | Fresh, immediate service |
Market Competition Reality
- Current Market: Only 3% of Dubai office buildings have rooftop amenities
- Barrier to Entry: Traditional construction takes 6-9 months + permits
- Your Advantage: First-mover with 12-week deployment
- Protection Period: 18-month head start before competition can respond
Operational Feasibility
Executive Pavilion Operations
Utilization Optimization Model
Time Slot | Rate (AED) | Target Utilization | Strategy |
---|---|---|---|
7-9 AM | 125 | 40% | Breakfast meetings |
9-12 PM | 200 | 80% | Premium hours |
12-2 PM | 200 | 90% | Lunch meetings |
2-5 PM | 175 | 85% | Afternoon sessions |
Booking Management System
- Technology: Cloud-based calendar with G-Suite/Office integration
- Payment: Online pre-payment reduces no-shows by 85%
- Access: Smart lock system with unique booking codes
- Policies: 24-hour cancellation, 2-hour minimum booking
Coffee Kiosk Operations
Operating Model Comparison
Model | Staff Cost | Net Profit (AED) | Recommendation |
---|---|---|---|
Lease | 0 | 156,000 | Low risk, stable |
Managed | 0 | 250,000 | Balanced approach |
Self-Operated | 96,000 | 312,000 | Maximum return |
Daily Operations Schedule
Revenue Capacity Analysis
- Service Capacity: 40-60 cups/hour
- Daily Throughput: 300-500 transactions
- Operating Hours: 11.5 hours daily
- Annual Potential: AED 2,780,000
Technical Excellence
Fire safety systems, 60-minute rated structures
Complete electrical infrastructure included
Professional 2-3 day setup process
Marine-grade aluminum, Low-E glazing
CAT6 data, WiFi ready, access control
Energy efficient, relocatable, minimal footprint
Revenue Utilization Scenarios
Scenario | Utilization | Annual Revenue | ROI | Payback Period |
---|---|---|---|---|
Conservative | 50% | AED 352,800 | 73% | 16.4 months |
Realistic | 65% | AED 773,400 | 195% | 6.2 months |
Optimistic | 80% | AED 900,000 | 232% | 5.2 months |
*Based on actual market rates and proven demand analysis
Implementation Timeline
Fast-Track Schedule (12 Weeks)
Pre-Launch Phase
Site survey, permits, operator selection, order confirmation
Production
Manufacturing, quality control, brand development, staff recruitment
Shipping & Transit
Sea freight, customs clearance, documentation, local delivery
Go-Live
Installation (2-3 days), testing, soft opening, operations start
Utilization Ramp-Up Projections
Month | Pavilion Utilization | Kiosk Utilization | Combined Revenue |
---|---|---|---|
Month 1 | 25% | 60% | AED 28,750 |
Month 2 | 40% | 75% | AED 41,200 |
Month 3 | 55% | 85% | AED 53,650 |
Month 4-6 | 65% | 90% | AED 64,450 |
Month 7+ | 75% | 95% | AED 71,875 |
Break-even achieved by Week 3 of operations
Full utilization breakeven: 15.8% utilization rate
Risk Assessment & Mitigation
Executive Pavilion Risks
Risk | Level | Mitigation Strategy |
---|---|---|
Low booking rate | Medium | Free trial month, member benefits program |
Weather damage | Low | 150km/h wind rating, comprehensive insurance |
Noise complaints | Medium | 45dB design limit, controlled usage hours |
Technology failures | Low | Manual backup systems, 24hr support |
Exit Strategy Options
- Removal: 2 days, AED 15,000 cost
- Relocation: Move to another building/area
- Resale: 70% value recovery to other developers
- Support: We assist with buyer identification
Coffee Kiosk Risks
Risk | Level | Mitigation Strategy |
---|---|---|
Operator failure | High | Performance bonds, backup operators network |
Equipment breakdown | Medium | Service contracts, spare parts inventory |
Health violations | Low | HACCP compliant design, regular audits |
Competition | Low | Location advantage, quality focus, exclusivity |
Sensitivity Analysis Impact
ROI remains positive even with significant parameter changes:
- -30% Utilization: Still 90%+ ROI
- -20% Pricing: Still 140%+ ROI
- +30% Costs: Still 150%+ ROI
Insurance & Operational Considerations
Insurance Impact
- Classified as temporary structure
- Premium increase: AED 2,000-3,000/year
- Full documentation package provided
Utility Consumption
- Pavilion: 450 kWh/month (summer)
- Kiosk: 350 kWh/month (average)
- Based on Dubai climate with AC usage
Maintenance Support
- 24/7 technical support included
- Annual maintenance: AED 15,000+
- Preventive maintenance schedule
Project Information & Commercial Terms
Complete project documentation and professional consultation available
Scope of Works Included
- ✅ Complete modular structures with premium finishes
- ✅ All internal electrical and data infrastructure
- ✅ Fire safety systems (DCD compliant)
- ✅ Plumbing rough-in and connections
- ✅ HVAC ducting pre-installation
- ✅ Sea freight and customs clearance
- ✅ Delivery to site in Dubai
- ✅ Professional installation (2-3 days)
- ✅ Testing and commissioning
- ✅ 12-month structural warranty
Client Requirements
- Level concrete pad or compacted gravel base
- Main electrical connection point (32A circuit)
- Water supply connection point
- Drainage/sewage connection point
- Site access for delivery trucks
- Any required permits for installation
Optional Furniture Packages
Pavilion Furniture: AED 42,630 (Executive table, chairs, AV equipment)
Kiosk Furniture: AED 20,265 (Barista counter, POS, seating)
Project Consultation
+971 52 247 1270
Edvinas B. | Managing Director
Technical Inquiry
sales@ebrahome.com
Roxanna A. | Chief Sales Officer
Project Reference
EBRA/QUO/0625-DMC
30-day quotation validity
Payment Schedule
Project Guarantees
- Delivery Timeline: 12 weeks from advance payment
- Structural Warranty: 12 months full coverage
- Component Warranty: 6-12 months components
- Installation Support: Professional supervision included